* Montgomery Watson was the prime architectural and engineering contractor for The Living Seas pavilion.
* The gravel floor in the Caribbean Coral Reef aquarium was replaced for the first time in 1998.
===Consultants===
Consultants that helped in the creation of The Living Seas included: